عربي term or phrase:
مخططات التنفيذ النهائية
أنجليزي translation:
Final Workshop Drawings
Added to glossary by
Akram Darwish
May 30, 2008 10:29
15 yrs ago
38 viewers *
عربي term
مخططات التنفيذ النهائية
عربي إلى أنجليزي
التقنية/الهندسة
الهندسة عموماً
Engineering
يتم تسليم مخططات التسليم النهائية وألبوم الصور الي فريق الاشراف
Proposed translations
(أنجليزي)
5 | Final Workshop Drawings | Akram Darwish |
4 +2 | final execution schemes | Zena Al-Zinc |
4 | As-Built Drawings | Moodi |
Change log
Oct 22, 2010 22:33: Akram Darwish Created KOG entry
Proposed translations
43 دقائق
Selected
Final Workshop Drawings
Good Luck
--------------------------------------------------
Note added at 52 mins (2008-05-30 11:22:01 GMT)
--------------------------------------------------
Alternatively, Final Working Drawings
http://www.ppu.edu/ann/cet/149.doc
http://www.kemnor.com.au/page/workshop_drawings.html
--------------------------------------------------
Note added at 1 hr (2008-05-30 11:33:16 GMT)
--------------------------------------------------
Also, "Final Shop Drawings"
A shop drawing is a drawing or set of drawings produced by the contractor, supplier, manufacturer, subcontractor, or fabricator.[1] Shop drawings are typically required for pre-fabricated components. Examples of these include: elevators, structural steel, trusses, pre-cast, windows, appliances, cabinets, air handling units,and millwork. Also critical are the installation and coordination shop drawings of the MEP trades of Divisions 15 and 16 such as sheet metal ductwork, piping, plumbing, fire protection, and electrical. Shop drawings are not produced by architects and engineers under their contract with the owner. The shop drawing is the manufacturer’s or the contractor’s drawn version of information shown in the construction documents.[1] The shop drawing normally shows more detail than the construction documents. It is drawn to explain the fabrication and/or installation of the items to the manufacturer’s production crew or contractor's installation crews. The style of the shop drawing is usually very different from that of the architect’s drawing. The shop drawing’s primary emphasis is on the particular product or installation and excludes notation concerning other products and installations, unless integration with the subject product is necessary.[1]
http://en.wikipedia.org/wiki/Shop_drawing
http://www.se-f.net/showthread.php?t=750&page=3
--------------------------------------------------
Note added at 52 mins (2008-05-30 11:22:01 GMT)
--------------------------------------------------
Alternatively, Final Working Drawings
http://www.ppu.edu/ann/cet/149.doc
http://www.kemnor.com.au/page/workshop_drawings.html
--------------------------------------------------
Note added at 1 hr (2008-05-30 11:33:16 GMT)
--------------------------------------------------
Also, "Final Shop Drawings"
A shop drawing is a drawing or set of drawings produced by the contractor, supplier, manufacturer, subcontractor, or fabricator.[1] Shop drawings are typically required for pre-fabricated components. Examples of these include: elevators, structural steel, trusses, pre-cast, windows, appliances, cabinets, air handling units,and millwork. Also critical are the installation and coordination shop drawings of the MEP trades of Divisions 15 and 16 such as sheet metal ductwork, piping, plumbing, fire protection, and electrical. Shop drawings are not produced by architects and engineers under their contract with the owner. The shop drawing is the manufacturer’s or the contractor’s drawn version of information shown in the construction documents.[1] The shop drawing normally shows more detail than the construction documents. It is drawn to explain the fabrication and/or installation of the items to the manufacturer’s production crew or contractor's installation crews. The style of the shop drawing is usually very different from that of the architect’s drawing. The shop drawing’s primary emphasis is on the particular product or installation and excludes notation concerning other products and installations, unless integration with the subject product is necessary.[1]
http://en.wikipedia.org/wiki/Shop_drawing
http://www.se-f.net/showthread.php?t=750&page=3
4 KudoZ points awarded for this answer.
Comment: "thank you"
+2
49 دقائق
final execution schemes
final execution schemes
Note from asker:
Peer comment(s):
agree |
phoenus
: I would say final execution drawings
33 دقائق
|
agree |
Shabbir Limbada
4 ساعات
|
2 ساعات
As-Built Drawings
.
Discussion