initial top 2-3 challenges

Arabic translation: أهم وأكبر 2-3 تحديات

GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW)
English term or phrase:initial top 2-3 challenges
Arabic translation:أهم وأكبر 2-3 تحديات
Entered by: Morano El-Kholy

23:24 Nov 17, 2020
English to Arabic translations [PRO]
Medical - Medical: Health Care
English term or phrase: initial top 2-3 challenges
What are the initial top 2-3 challenges you can see to provide access to achieve the final P&A?
Belal Hegazy
Egypt
Local time: 00:03
أهم وأكبر 2-3 تحديات
Explanation:
What are the initial top 2-3 challenges you can see to provide access to achieve the final Plug & Abandonment?
**************************************
The challenges requiring the most deliberation include: (1) Partial plug & abandonment: A permanent abandonment of the bottom of the well and drilling new well from the upper section to access more productive targets allowing continued use of the existing platform infrastructure. The practice is known as slot recovery program. (2) Requirements of local regulatory agencies: The steps required to qualify the offshore wells as permanently abandoned vary widely with the local regulatory jurisdiction. The governing bodies of the North Sea and the Gulf of Mexico are good examples of slightly varying requirements for well abandonment. (3) Combining safety and economics in meeting the above two challenges. To meet these challenges, the offshore service companies have worked with the operators in developing innovative technical solutions that are economically viable and safety compliant.

https://www.researchgate.net/publication/266670329_Offshore_...
*****************************************
In P&A, establishing the annular barrier is one of the main challenges. In order to overcome the challenge, it has been suggested to use explosives for expanding the casing to create a seal or foundation for the annular barrier to be placed on. The amount of explosives to be used is selected in such a way that the casing will be ballooned but not ruptured. The challenge is to select the correct amount of explosive required as the casing string may not have its original thickness due to corrosion. This technique has been lab and yard tested but today has not been applied in the field.

https://link.springer.com/chapter/10.1007/978-3-030-39970-2_...
***************************
https://www.sciencedirect.com/science/article/pii/S092041051...
*******************************
والله أعلم
Selected response from:

Morano El-Kholy
Egypt
Local time: 00:03
Grading comment
4 KudoZ points were awarded for this answer



Summary of answers provided
4 +1أهم وأكبر 2-3 تحديات
Morano El-Kholy


  

Answers


7 hrs   confidence: Answerer confidence 4/5Answerer confidence 4/5 peer agreement (net): +1
أهم وأكبر 2-3 تحديات


Explanation:
What are the initial top 2-3 challenges you can see to provide access to achieve the final Plug & Abandonment?
**************************************
The challenges requiring the most deliberation include: (1) Partial plug & abandonment: A permanent abandonment of the bottom of the well and drilling new well from the upper section to access more productive targets allowing continued use of the existing platform infrastructure. The practice is known as slot recovery program. (2) Requirements of local regulatory agencies: The steps required to qualify the offshore wells as permanently abandoned vary widely with the local regulatory jurisdiction. The governing bodies of the North Sea and the Gulf of Mexico are good examples of slightly varying requirements for well abandonment. (3) Combining safety and economics in meeting the above two challenges. To meet these challenges, the offshore service companies have worked with the operators in developing innovative technical solutions that are economically viable and safety compliant.

https://www.researchgate.net/publication/266670329_Offshore_...
*****************************************
In P&A, establishing the annular barrier is one of the main challenges. In order to overcome the challenge, it has been suggested to use explosives for expanding the casing to create a seal or foundation for the annular barrier to be placed on. The amount of explosives to be used is selected in such a way that the casing will be ballooned but not ruptured. The challenge is to select the correct amount of explosive required as the casing string may not have its original thickness due to corrosion. This technique has been lab and yard tested but today has not been applied in the field.

https://link.springer.com/chapter/10.1007/978-3-030-39970-2_...
***************************
https://www.sciencedirect.com/science/article/pii/S092041051...
*******************************
والله أعلم

Morano El-Kholy
Egypt
Local time: 00:03
Specializes in field
Native speaker of: Native in ArabicArabic
PRO pts in category: 44

Peer comments on this answer (and responses from the answerer)
agree  Mahmoud Ibrahim
1 hr
  -> Thank you a lot.
Login to enter a peer comment (or grade)



Login or register (free and only takes a few minutes) to participate in this question.

You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.

KudoZ™ translation help

The KudoZ network provides a framework for translators and others to assist each other with translations or explanations of terms and short phrases.


See also:
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search