Re-Roof Tear-off

French translation: démontage de la couverture du toit (planches de revêtement espacées)

GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW)
English term or phrase:Re-Roof Tear-off
French translation:démontage de la couverture du toit (planches de revêtement espacées)
Entered by: FX Fraipont (X)

23:50 Oct 8, 2019
English to French translations [PRO]
Tech/Engineering - Construction / Civil Engineering / Tuiles et bardeaux
English term or phrase: Re-Roof Tear-off
Deck Preparation
New Construction: Prepare roof deck to meet local building codes.
Roof Tear-off (Solid Deck): If tearing off old roof, clean and prepare deck to meet local building codes.
Re-Roof Tear-off (Skip/Spaced Sheathing): There are two options available when skip/spaced
sheathing is encountered. Use counter battens and battens without filling or fill as necessary and install just
battens.
Re-Roof Over Even Surfaces (i.e. Asphalt Shingles): Prepare the asphalt shingles by cutting
them back, flush with the fascia or rake, as needed. Remove existing hip and ridge material. Install Tile or
Shake with battens.
Marilyn D.
France
Local time: 06:22
démontage de la couverture du toit (planches de revêtement espacées)
Explanation:
"What is skip-sheathing?

When you think of a modern plywood roof deck, you’re not imagining gaps between the sheets of plywood. The entire roof deck is relatively uniform, where you can step on any part of it without slipping through spaces.

Skip-sheeting, or spaced sheathing, is just as it sounds: sheathing with gaps between. Traditionally, skip-sheathing consists of 1 inch by 4 inch boards nailed to the rafters with gaps between the boards. Spacing between boards is optimal for wood shakes but cannot support asphalt composite shingles."
https://www.chasenw.com/blog/skip-sheathing-as-a-roof-deck/
Selected response from:

FX Fraipont (X)
Belgium
Local time: 06:22
Grading comment
4 KudoZ points were awarded for this answer



Summary of answers provided
4démontage de la couverture du toit (planches de revêtement espacées)
FX Fraipont (X)


  

Answers


5 hrs   confidence: Answerer confidence 4/5Answerer confidence 4/5
re-roof tear-off
démontage de la couverture du toit (planches de revêtement espacées)


Explanation:
"What is skip-sheathing?

When you think of a modern plywood roof deck, you’re not imagining gaps between the sheets of plywood. The entire roof deck is relatively uniform, where you can step on any part of it without slipping through spaces.

Skip-sheeting, or spaced sheathing, is just as it sounds: sheathing with gaps between. Traditionally, skip-sheathing consists of 1 inch by 4 inch boards nailed to the rafters with gaps between the boards. Spacing between boards is optimal for wood shakes but cannot support asphalt composite shingles."
https://www.chasenw.com/blog/skip-sheathing-as-a-roof-deck/

FX Fraipont (X)
Belgium
Local time: 06:22
Works in field
Native speaker of: Native in FrenchFrench
PRO pts in category: 1816
Login to enter a peer comment (or grade)



Login or register (free and only takes a few minutes) to participate in this question.

You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.

KudoZ™ translation help

The KudoZ network provides a framework for translators and others to assist each other with translations or explanations of terms and short phrases.


See also:
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search