walk-over survey

Polish translation: wizja terenowa, pomiary/badania terenowe

GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW)
English term or phrase:walk-over survey
Polish translation:wizja terenowa, pomiary/badania terenowe
Entered by: Angren

11:15 Mar 11, 2020
English to Polish translations [PRO]
Tech/Engineering - Construction / Civil Engineering
English term or phrase: walk-over survey
Recent experience while working for K2 Management includes design of foundation structures (including third part verification) for three wind farms in Denmark, being responsible for re-calculation and proposal of remediate action for a major wind farm in Asia, review of proposed calculation methodology for a US offshore wind farm, including parallel calculation of sub-structures (including grouted connections), conducting desk-study and walk-over survey to identify suitable foundation designs for wind farms in Norway (rock-anchored foundations) and Sweden, and undertaking the development of new foundation concepts for WTGs.
Angren
Local time: 22:29
wizja terenowa, pomiary/badania terenowe
Explanation:

Walkover survey

A walkover survey is a basic site survey which can form part of the early site investigation process at the beginning of a project. It involves walking over the site and the surrounding area and recording any observed information which may be relevant to the project. It may be part a wider desk-based study of the site.

A walkover survey should highlight any immediately apparent geological, ecological, topographical or other issues which may present constraints to the project, such as; the presence of protected species, contamination, site obstructions, access problems, water sources, trees, site boundaries and so on. It may incorporate additional information gathered from local authorities, local residents and people who work in the vicinity of the site. It should identify any areas where further and potentially more detailed surveys may be necessary. - https://www.designingbuildings.co.uk/wiki/Walkover_survey

--

W pierwszym etapie prac określono zasięg analiz przyrodniczych. W trakcie badań terenowych analizowano zasoby przyrodnicze danego obszaru. Wizje terenowe obejmowały miejsce planowanej inwestycji.

b) Analiza mykologiczna terenu objętego planowanym zamierzeniem inwestycyjnym przebiegała wg. takiej samej metodyki, jaką przyjęto przy analizie florystycznej (pkt. 3.a)
c) Metody zbierania danych faunistycznych
• Szukano odchodów i miejsc żerowania

- http://www.bip.topolka.pl/upload/załącznik nr 28.pdf - page 6

--

W dniach 20-21 stycznia przeprowadzono wizję terenową trasy gazociągu dla potencjalnych oferentów prac budowlanym biorących udział w postępowaniu przetargowym. Objazd trasy odbył się w miejscach trudnych pod względem technicznym, technologicznym lub lokalizacyjnym. - http://gazociagpolskalitwa.pl/poludniowa-realizacja-inwestyc...

--

W dniu 15 września odbyła się wizja terenowa w miejscowości Nowa Ruda (w miejscu planowanej inwestycji) mająca na celu weryfikację zgłoszenia o zagrożeniu szkodą. - http://straznicy.natura2000.pl/index_interwencje.php?dzial=3...

--

11 maja 2019 r. przedstawiciele Regionalnej Dyrekcji Ochrony Środowiska w Bydgoszczy, wspólnie z inwestorem, tj. Generalną Dyrekcją Dróg Krajowych i Autostrad Oddział w Bydgoszczy oraz Nadleśniczymi Nadleśnictw Bydgoszcz, Solec Kujawski i Cierpiszewo, przeprowadzili wizję terenową przebiegu planowanej do realizacji drogi ekspresowej S-10, zgodnie z trasą wariantu preferowanego. - http://bydgoszcz.rdos.gov.pl/wizja-terenowa-przebiegu-drogi-...

--

Pracownicy Regionalnej Dyrekcji Ochrony Środowiska w Rzeszowie wspólnie z pracownikami firmy Gaz System S.A. 2 czerwca 2015 r. przeprowadzili wizję terenową na granicy polsko–słowackiej w obrębie Przełęczy Łupkowskiej w miejscowości Łupków, w miejscach gdzie, zgodnie z rozpatrywanymi wariantami, projektowany gazociąg pomiędzy Polską, a Słowacją może przeciąć granicę państwową. - http://www.gdos.gov.pl/wspolpraca-rdos-w-rzeszowie-w-zakresi...




Selected response from:

geopiet
Grading comment
Bardzo dziękuję.
4 KudoZ points were awarded for this answer



Summary of answers provided
3badanie polowe/terenowe/ (wizyta) na miejscu robot
Frank Szmulowicz, Ph. D.
3wizja lokalna
mike23
3wizja terenowa, pomiary/badania terenowe
geopiet
2przegląd na miejscu
Frank Szmulowicz, Ph. D.


Discussion entries: 1





  

Answers


19 mins   confidence: Answerer confidence 2/5Answerer confidence 2/5
przegląd na miejscu


Explanation:
The walk-over survey is an integral and important part of the site investigation process which should always be carried out. Used in conjunction with a good desk study (Digest 318), it provides valuable information which cannot be obtained in any other way. The object of the survey is to check and make additions to the information already collected during the desk study. The site and its surrounding area should be visited and covered carefully on foot. Local authorities, local inhabitants and people working in the area, such as builders, electricity and gas workers, should be questioned to obtain the benefit of their local knowledge. A structured report is then produced from the information gathered at the site and from local enquiries.
https://www.ihsti.com/CIS/document/15156

Frank Szmulowicz, Ph. D.
United States
Local time: 16:29
Works in field
Native speaker of: Native in EnglishEnglish, Native in PolishPolish
PRO pts in category: 1028
Login to enter a peer comment (or grade)

23 mins   confidence: Answerer confidence 3/5Answerer confidence 3/5
badanie polowe/terenowe/ (wizyta) na miejscu robot


Explanation:
Inne opcje oparte na definicji walk-over survey jako site investigation.

Frank Szmulowicz, Ph. D.
United States
Local time: 16:29
Works in field
Native speaker of: Native in EnglishEnglish, Native in PolishPolish
PRO pts in category: 1028
Login to enter a peer comment (or grade)

25 mins   confidence: Answerer confidence 3/5Answerer confidence 3/5
wizja lokalna


Explanation:
wizja lokalna

Tak na to mówią u mnie w firmie.

mike23
Poland
Local time: 22:29
Native speaker of: Native in PolishPolish
PRO pts in category: 80
Login to enter a peer comment (or grade)

2 hrs   confidence: Answerer confidence 3/5Answerer confidence 3/5
wizja terenowa, pomiary/badania terenowe


Explanation:

Walkover survey

A walkover survey is a basic site survey which can form part of the early site investigation process at the beginning of a project. It involves walking over the site and the surrounding area and recording any observed information which may be relevant to the project. It may be part a wider desk-based study of the site.

A walkover survey should highlight any immediately apparent geological, ecological, topographical or other issues which may present constraints to the project, such as; the presence of protected species, contamination, site obstructions, access problems, water sources, trees, site boundaries and so on. It may incorporate additional information gathered from local authorities, local residents and people who work in the vicinity of the site. It should identify any areas where further and potentially more detailed surveys may be necessary. - https://www.designingbuildings.co.uk/wiki/Walkover_survey

--

W pierwszym etapie prac określono zasięg analiz przyrodniczych. W trakcie badań terenowych analizowano zasoby przyrodnicze danego obszaru. Wizje terenowe obejmowały miejsce planowanej inwestycji.

b) Analiza mykologiczna terenu objętego planowanym zamierzeniem inwestycyjnym przebiegała wg. takiej samej metodyki, jaką przyjęto przy analizie florystycznej (pkt. 3.a)
c) Metody zbierania danych faunistycznych
• Szukano odchodów i miejsc żerowania

- http://www.bip.topolka.pl/upload/załącznik nr 28.pdf - page 6

--

W dniach 20-21 stycznia przeprowadzono wizję terenową trasy gazociągu dla potencjalnych oferentów prac budowlanym biorących udział w postępowaniu przetargowym. Objazd trasy odbył się w miejscach trudnych pod względem technicznym, technologicznym lub lokalizacyjnym. - http://gazociagpolskalitwa.pl/poludniowa-realizacja-inwestyc...

--

W dniu 15 września odbyła się wizja terenowa w miejscowości Nowa Ruda (w miejscu planowanej inwestycji) mająca na celu weryfikację zgłoszenia o zagrożeniu szkodą. - http://straznicy.natura2000.pl/index_interwencje.php?dzial=3...

--

11 maja 2019 r. przedstawiciele Regionalnej Dyrekcji Ochrony Środowiska w Bydgoszczy, wspólnie z inwestorem, tj. Generalną Dyrekcją Dróg Krajowych i Autostrad Oddział w Bydgoszczy oraz Nadleśniczymi Nadleśnictw Bydgoszcz, Solec Kujawski i Cierpiszewo, przeprowadzili wizję terenową przebiegu planowanej do realizacji drogi ekspresowej S-10, zgodnie z trasą wariantu preferowanego. - http://bydgoszcz.rdos.gov.pl/wizja-terenowa-przebiegu-drogi-...

--

Pracownicy Regionalnej Dyrekcji Ochrony Środowiska w Rzeszowie wspólnie z pracownikami firmy Gaz System S.A. 2 czerwca 2015 r. przeprowadzili wizję terenową na granicy polsko–słowackiej w obrębie Przełęczy Łupkowskiej w miejscowości Łupków, w miejscach gdzie, zgodnie z rozpatrywanymi wariantami, projektowany gazociąg pomiędzy Polską, a Słowacją może przeciąć granicę państwową. - http://www.gdos.gov.pl/wspolpraca-rdos-w-rzeszowie-w-zakresi...






geopiet
Native speaker of: Native in PolishPolish
PRO pts in category: 440
Grading comment
Bardzo dziękuję.
Login to enter a peer comment (or grade)



Login or register (free and only takes a few minutes) to participate in this question.

You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.

KudoZ™ translation help

The KudoZ network provides a framework for translators and others to assist each other with translations or explanations of terms and short phrases.


See also:
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search