6-inch lift

Polish translation: nasyp/zasypka 6 cali / 15 cm

13:40 Apr 7, 2010
English to Polish translations [PRO]
Tech/Engineering - Geology
English term or phrase: 6-inch lift
Częśc tabeli pt: Site Earthwork

1-CY hydraulic excavator
Loading into truck
Backfill, unclassified fill, 6-inch lift, offsite
madziag
Local time: 10:09
Polish translation:nasyp/zasypka 6 cali / 15 cm
Explanation:
Site Earthwork
l-CY hydraulic excavator
Loading into truck
Backfill, unclassified fill, 6-inch lift</b, offsite - http://www.p2pays.org/ref/17/16775.pdf - page 26

----------------------------------

Place structural backfill material around piping, structures, and other areas, including
authorized overexcavation areas, to the lines and grades shown or specified. Do not
exceed loose lifts of 8 inches.

Place native earth backfill in maximum 8-inch loose lifts and compact each lift to a minimum of 90% relative compaction, unless otherwise shown.

Place fill in maximum 8-inch lifts and compact each lift to 90% relative compaction

http://tinyurl.com/yzvr7s7 - page 5

------------------------------------

Wymagana jest warstwa zasypki co najmniej 15 cm. - http://tinyurl.com/yjjeewk - 4. strona

-----------------------------------



--------------------------------------------------
Note added at 9 hrs (2010-04-07 22:59:52 GMT)
--------------------------------------------------

Do not exceed loose lifts of 8 inches. Compact each lift to a minimum of 90% relative compaction, unless otherwise shown.

Place native earth backfill in maximum 8-inch loose lifts and compact each lift to a minimum of 90% relative compaction, unless otherwise shown.

Place fill in maximum 8-inch lifts and compact each lift to 90% relative compaction.

http://tinyurl.com/yzvr7s7 - 5. strona

-------------------------------------

Wymagana jest warstwa zasypki co najmniej 15 cm. - http://tinyurl.com/yjjeewk - 4. strona

--------------------------------------------------
Note added at 9 hrs (2010-04-07 23:04:11 GMT)
--------------------------------------------------

Do not exceed loose lifts of 8 inches. Compact each lift to a minimum of 90% relative compaction, unless otherwise shown.

Place native earth backfill in maximum 8-inch loose lifts and compact each lift to a minimum of 90% relative compaction, unless otherwise shown.

Place fill in maximum 8-inch lifts and compact each lift to 90% relative compaction.

http://tinyurl.com/yzvr7s7 - 5. strona


------------------------

Wymagana jest warstwa zasypki co najmniej 15 cm - http://tinyurl.com/yjjeewk - 4. strona

--------------------------------------------------
Note added at 9 hrs (2010-04-07 23:04:41 GMT)
--------------------------------------------------

Do not exceed loose lifts of 8 inches. Compact each lift to a minimum of 90% relative compaction, unless otherwise shown.

Place native earth backfill in maximum 8-inch loose lifts and compact each lift to a minimum of 90% relative compaction, unless otherwise shown.

Place fill in maximum 8-inch lifts and compact each lift to 90% relative compaction.

http://tinyurl.com/yzvr7s7 - 5. strona


------------------------

Wymagana jest warstwa zasypki co najmniej 15 cm - http://tinyurl.com/yjjeewk - 4. strona
Selected response from:

geopiet
Grading comment
dziękuję pięknie!
4 KudoZ points were awarded for this answer



Summary of answers provided
3nasyp/zasypka 6 cali / 15 cm
geopiet


Discussion entries: 1





  

Answers


9 hrs   confidence: Answerer confidence 3/5Answerer confidence 3/5
nasyp/zasypka 6 cali / 15 cm


Explanation:
Site Earthwork
l-CY hydraulic excavator
Loading into truck
Backfill, unclassified fill, 6-inch lift</b, offsite - http://www.p2pays.org/ref/17/16775.pdf - page 26

----------------------------------

Place structural backfill material around piping, structures, and other areas, including
authorized overexcavation areas, to the lines and grades shown or specified. Do not
exceed loose lifts of 8 inches.

Place native earth backfill in maximum 8-inch loose lifts and compact each lift to a minimum of 90% relative compaction, unless otherwise shown.

Place fill in maximum 8-inch lifts and compact each lift to 90% relative compaction

http://tinyurl.com/yzvr7s7 - page 5

------------------------------------

Wymagana jest warstwa zasypki co najmniej 15 cm. - http://tinyurl.com/yjjeewk - 4. strona

-----------------------------------



--------------------------------------------------
Note added at 9 hrs (2010-04-07 22:59:52 GMT)
--------------------------------------------------

Do not exceed loose lifts of 8 inches. Compact each lift to a minimum of 90% relative compaction, unless otherwise shown.

Place native earth backfill in maximum 8-inch loose lifts and compact each lift to a minimum of 90% relative compaction, unless otherwise shown.

Place fill in maximum 8-inch lifts and compact each lift to 90% relative compaction.

http://tinyurl.com/yzvr7s7 - 5. strona

-------------------------------------

Wymagana jest warstwa zasypki co najmniej 15 cm. - http://tinyurl.com/yjjeewk - 4. strona

--------------------------------------------------
Note added at 9 hrs (2010-04-07 23:04:11 GMT)
--------------------------------------------------

Do not exceed loose lifts of 8 inches. Compact each lift to a minimum of 90% relative compaction, unless otherwise shown.

Place native earth backfill in maximum 8-inch loose lifts and compact each lift to a minimum of 90% relative compaction, unless otherwise shown.

Place fill in maximum 8-inch lifts and compact each lift to 90% relative compaction.

http://tinyurl.com/yzvr7s7 - 5. strona


------------------------

Wymagana jest warstwa zasypki co najmniej 15 cm - http://tinyurl.com/yjjeewk - 4. strona

--------------------------------------------------
Note added at 9 hrs (2010-04-07 23:04:41 GMT)
--------------------------------------------------

Do not exceed loose lifts of 8 inches. Compact each lift to a minimum of 90% relative compaction, unless otherwise shown.

Place native earth backfill in maximum 8-inch loose lifts and compact each lift to a minimum of 90% relative compaction, unless otherwise shown.

Place fill in maximum 8-inch lifts and compact each lift to 90% relative compaction.

http://tinyurl.com/yzvr7s7 - 5. strona


------------------------

Wymagana jest warstwa zasypki co najmniej 15 cm - http://tinyurl.com/yjjeewk - 4. strona

geopiet
Native speaker of: Native in PolishPolish
PRO pts in category: 44
Grading comment
dziękuję pięknie!
Login to enter a peer comment (or grade)



Login or register (free and only takes a few minutes) to participate in this question.

You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.

KudoZ™ translation help

The KudoZ network provides a framework for translators and others to assist each other with translations or explanations of terms and short phrases.


See also:
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search