Glossary entry

Portuguese term or phrase:

Licença Prévia

English translation:

preliminary permit

Added to glossary by rhandler
Sep 1, 2007 23:21
16 yrs ago
8 viewers *
Portuguese term

Licença Prévia

Portuguese to English Other Real Estate Survey
LICENCIAMENTO AMBIENTAL: a Prefeitura exige Licença Prévia, Licença de Implantação e Licença de Ocupação.
Change log

Sep 4, 2007 10:17: rhandler Created KOG entry

Proposed translations

+2
13 mins
Selected

preliminary permit

Permit é a palavra, quando se trata de licenciamento ambiental. Veja estes exemplos:

[PDF] ORIGINAL
File Format: PDF/Adobe Acrobat - View as HTML
Generates clean and renewable with no negative impact on the environment or the .... preliminary permit. Initiate permitting and environmental studies ...
www.co.lincoln.or.us/counsel/NOPTWP/20061116-application.pd...

Recent Decisions from the Environmental Hearings Boards
Finally, CPU and Ecology contended that environmental review for the preliminary permit was adequately covered by an earlier SEPA review conducted for CPU’s ...
www.eho.wa.gov/Newsletters/2004-11_Newsletter.htm

[PDF] INSTREAM TIDAL POWER IN NORTH AMERICA ENVIRONMENTAL AND PERMITTING ...
File Format: PDF/Adobe Acrobat
During the environmental permitting process for each project, it ..... In effect, a developer that obtains a preliminary permit secures ...
www.epri.com/oceanenergy/attachments/streamenergy/reports/0...

[PDF] Agenda Item
File Format: PDF/Adobe Acrobat - View as HTML
g) Preparation of preliminary permit documents as required; ... CONSULTANT will initiate the portion of the PROJECT environmental permitting process ...
http://docserver.tampagov.net/cache/00001/274/00000018.PDF


Peer comment(s):

agree Humberto Ribas
7 hrs
Obrigado, Humberto, bom domingo!
agree T o b i a s
2139 days
Something went wrong...
4 KudoZ points awarded for this answer. Comment: "thanks everyone"
2 mins

prior authorization

maybe ...

--------------------------------------------------
Note added at 5 mins (2007-09-01 23:26:47 GMT)
--------------------------------------------------

or: project planning permission
Something went wrong...
14 mins

Previous License

License previously issued.
Something went wrong...
+1
16 mins

Preliminary license

Regarding the compliance with environmental legislation of the host country, the Brazilian regulationrequires an environmental licensing process, including: the preliminary license (Licença Prévia or LP),the construction license (Licença de Instalação or LI); and the operating license (Licenca de Operaçãoor LO).
http://209.85.135.104/search?q=cache:PzdeuVzmXMsJ:cdm.unfccc...

Regarding the compliance with environmental legislation of the host country, it is not required an EIA for small hydro plants with this capacity and reservoir area. The project sponsors are required to obtain the environmental licenses defined by the Brazilian environmental regulation, including: the preliminary license (Licença Prévia or LP), the construction
F-CDM-REG Version 02 / November 2002license (Licença de Instalação or LI); and the operating license (Licenca de Operação or LO).
http://209.85.135.104/search?q=cache:I8CwrxJ7OHsJ:www.mct.go...

Peer comment(s):

agree BLR : I prefer 'license' to 'permit' within this sphere of Environmental Licensing
4401 days
Something went wrong...
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search