Apr 8, 2015 22:05
9 yrs ago
English term
run
English to Romanian
Tech/Engineering
Engineering (general)
manual supape
Routing of pipework
Pipework in the main supply network in the plant should be installed at a slightly inclined angle. Long runs should be alternately inclined downwards and upwards.
Pipework in the main supply network in the plant should be installed at a slightly inclined angle. Long runs should be alternately inclined downwards and upwards.
Proposed translations
(Romanian)
5 | secţiune | Péter Tófalvi |
Proposed translations
54 mins
Selected
secţiune
Secţiunile de conductă lungi trebuie îndoite alternativ în jos şi în sus.
4 KudoZ points awarded for this answer.
Comment: "merci!"
Something went wrong...