15:36 May 4, 2015 |
|
Danish to English translations [PRO] Tech/Engineering - Construction / Civil Engineering / VVS | |||||||
---|---|---|---|---|---|---|---|
|
|
Summary of answers provided | ||||
---|---|---|---|---|
1 | test boring |
|
Discussion entries: 2 | |
---|---|
søgebording test boring Explanation: my take but this is a long shot: for all drainage systems, the contractor must undertake test borings to determine the presence of any conflicting (preexisting) underlying (underground) structures (not identified in previous technical drawings), so that the (drainage system) installations can be moved sideways according to the instructions which this material describes. |
| ||
Notes to answerer
| |||
Login to enter a peer comment (or grade) |
Login or register (free and only takes a few minutes) to participate in this question.
You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.