Glossary entry (derived from question below)
English term or phrase:
contingency area
French translation:
zone des opérations urgentes
Added to glossary by
GILLES MEUNIER
Oct 21, 2016 06:14
7 yrs ago
English term
contingency area
English to French
Tech/Engineering
Petroleum Eng/Sci
gas pipeline construction
This right of way (RoW) will include the following general arrangement:
• 5 m wide excavated material;
• 5 m wide welding area;
• 2 m wide pipeline trench;
• 15 m wide side working area for excavators;
• 15 m wide running area;
• 5 m wide topsoil storage area; and
• 3m wide contingency area.
• 5 m wide excavated material;
• 5 m wide welding area;
• 2 m wide pipeline trench;
• 15 m wide side working area for excavators;
• 15 m wide running area;
• 5 m wide topsoil storage area; and
• 3m wide contingency area.
Proposed translations
(French)
5 +2 | zone des opérations urgentes | GILLES MEUNIER |
4 | zone d'urgence | FX Fraipont (X) |
3 | Zone de préparation des urgences. | Chakib Roula |
Change log
Nov 4, 2016 09:38: GILLES MEUNIER Created KOG entry
Proposed translations
+2
24 mins
Selected
zone des opérations urgentes
-
--------------------------------------------------
Note added at 26 minutes (2016-10-21 06:41:24 GMT)
--------------------------------------------------
c'est une zone affectée aux opérations urgentes uniquement
--------------------------------------------------
Note added at 26 minutes (2016-10-21 06:41:24 GMT)
--------------------------------------------------
c'est une zone affectée aux opérations urgentes uniquement
4 KudoZ points awarded for this answer.
Comment: "Selected automatically based on peer agreement."
13 mins
20 mins
zone d'urgence
"Plan d'urgence intégré d'Enbridge
http://www.enbridge.com/.../EasternRegion ICPC25AV13FrenchRe...
d'une servitude de pipeline sans oublier le service de police, le département ...... 2.4.3.6d Équipe d'intervention de terrain - Fuites de gaz naturel/autres . ...... Isoler la zone d'urgence dangereuse en utilisant des barrages routiers supervisés. →."
http://www.enbridge.com/.../EasternRegion ICPC25AV13FrenchRe...
d'une servitude de pipeline sans oublier le service de police, le département ...... 2.4.3.6d Équipe d'intervention de terrain - Fuites de gaz naturel/autres . ...... Isoler la zone d'urgence dangereuse en utilisant des barrages routiers supervisés. →."
Something went wrong...