Glossary entry (derived from question below)
English term or phrase:
resource loaded project schedule
Hungarian translation:
betöltött erőforrásokat tartalmazó ütemterv
Added to glossary by
Katalin Szilárd
Oct 8, 2018 06:47
5 yrs ago
English term
resource loaded projekt schedule
English to Hungarian
Bus/Financial
Management
Project management
Could someone please inform me of the Hungarian equivalent of the term "resource loaded" used in a WANO Guidline.
"Generate a resource-loaded projekt schedule for all work activities based on the WBS (FeladatLebontási Terv). The schedule must be developed to an appropriate level to enable the monitoring of progress and to assess earned value and overall projekt performance."
Thanks in advance.
"Generate a resource-loaded projekt schedule for all work activities based on the WBS (FeladatLebontási Terv). The schedule must be developed to an appropriate level to enable the monitoring of progress and to assess earned value and overall projekt performance."
Thanks in advance.
Proposed translations
(Hungarian)
Change log
Oct 14, 2018 18:47: Katalin Szilárd Created KOG entry
Oct 14, 2018 18:50: Katalin Szilárd changed "Edited KOG entry" from "<a href="/profile/23021">Katalin Szilárd's</a> old entry - "resource loaded projekt schedule"" to ""betöltött erőforrásokat tartalmazó ütemterv""
Proposed translations
20 mins
English term (edited):
resource loaded project schedule
Selected
erőforrásokat részletező projekt ütemterv / erőforrás-részletező projekt ütemterv
www.taskmanagementguide.com/glossary/what-is-a-resource-loaded-schedule-.php
Resource Loaded Schedule is a project-related schedule that consists of a timeline with details on allocated resources, planned activities and preset milestones. It is a time management document that explains how project resources (people, funds, inventories) are supposed to be consumed throughout scheduled project time and whether allocation rules appear to be effective to ensure appropriate resource consumption and use.
Resource loaded schedule of a project is a great visual representation of how available project resources are allocated to scheduled activities. The project appears to be well scheduled when the overall project duration is defined by individual activity durations along with individual resource estimates.
Resource loaded schedule is best used in combination with resource allocation plan so that the project manager can use both documents to analyze resource availability and schedule appropriateness and confirm both constraints (resources and time). Milestones will help the project manager to check the constraints against the baseline (original estimation of all project resources incl. time, HR, funds, materials) throughout the project implementation process.
--------------------------------------------------
Note added at 1 hr (2018-10-08 08:17:15 GMT)
--------------------------------------------------
https://pm-foundations.com/2011/03/21/pm-foundations-estimat...
Itt különveszi az allocation és a loading folyamatát.
Resource Allocation:
The following steps describe the mechanics of this technique:
Group activities based upon allocation of resources (may be one to one, but more likely will have activities with the same allocation over some period of time).
Assign allocation % for each resource assigned to the activity in the Project Management tool.
The Project Management tool computes the number of hours of work effort for the activities (based upon the allocation % and duration estimated for the activity).
Resource Loading:
Once the resource estimating process is complete, the mechanics of loading resources into the schedule is very straight forward. From the resource tab on the individual task, or from the resource column in the Gantt view (assuming you are using MS Project as your PM tool), the resources are added in the following manner (depending upon the approach selected):
1) Approach #1: Select the resource, enter the hours in the work column, and the % allocation will be computed.
2) Approach #2: Select the resource(s), enter the % in the units column, and the work hours will be computed.
Another key element associated with the resource loading process is the task type set-up for the activity.
Én Székány András ötlete (feltöltés) alapján erre jutottam:
betöltött erőforrásokat tartalmazó ütemterv
https://www.academiccourses.hu/Projektmenedzsment-2.-szint/N...
Erőforrás betöltése
Resource Loaded Schedule is a project-related schedule that consists of a timeline with details on allocated resources, planned activities and preset milestones. It is a time management document that explains how project resources (people, funds, inventories) are supposed to be consumed throughout scheduled project time and whether allocation rules appear to be effective to ensure appropriate resource consumption and use.
Resource loaded schedule of a project is a great visual representation of how available project resources are allocated to scheduled activities. The project appears to be well scheduled when the overall project duration is defined by individual activity durations along with individual resource estimates.
Resource loaded schedule is best used in combination with resource allocation plan so that the project manager can use both documents to analyze resource availability and schedule appropriateness and confirm both constraints (resources and time). Milestones will help the project manager to check the constraints against the baseline (original estimation of all project resources incl. time, HR, funds, materials) throughout the project implementation process.
--------------------------------------------------
Note added at 1 hr (2018-10-08 08:17:15 GMT)
--------------------------------------------------
https://pm-foundations.com/2011/03/21/pm-foundations-estimat...
Itt különveszi az allocation és a loading folyamatát.
Resource Allocation:
The following steps describe the mechanics of this technique:
Group activities based upon allocation of resources (may be one to one, but more likely will have activities with the same allocation over some period of time).
Assign allocation % for each resource assigned to the activity in the Project Management tool.
The Project Management tool computes the number of hours of work effort for the activities (based upon the allocation % and duration estimated for the activity).
Resource Loading:
Once the resource estimating process is complete, the mechanics of loading resources into the schedule is very straight forward. From the resource tab on the individual task, or from the resource column in the Gantt view (assuming you are using MS Project as your PM tool), the resources are added in the following manner (depending upon the approach selected):
1) Approach #1: Select the resource, enter the hours in the work column, and the % allocation will be computed.
2) Approach #2: Select the resource(s), enter the % in the units column, and the work hours will be computed.
Another key element associated with the resource loading process is the task type set-up for the activity.
Én Székány András ötlete (feltöltés) alapján erre jutottam:
betöltött erőforrásokat tartalmazó ütemterv
https://www.academiccourses.hu/Projektmenedzsment-2.-szint/N...
Erőforrás betöltése
Note from asker:
Köszönöm. |
Köszönöm. |
Peer comment(s):
neutral |
András Veszelka
: Az öt példámmal szemben te is írtál akkor egyet, de ez egy konkrét szoftver használatát írja le, ahol az erőforrásokat a szoftverbe töltik be, ezért használnak itt rá külön fogalmat. A magyar példa pedig feltehetőleg túl mechanikus fordítás eredménye.
1 hr
|
Az allokáció is számítógéppel történik. Nem azért van rá 2 külön kifejezés. Hanem valahol különszedik a 2-t van ahol nem (nem mennek bele a részletekbe). https://pm-foundations.com/tag/project-schedule/ loaded based upon a percent allocation for resources
|
4 KudoZ points awarded for this answer.
Comment: "Elnézést kérek mindenkitől, hogy egy sokáig nem reagáltam. Hirtelen el kellett utaznom."
53 mins
projektterv, feltöltött erőforrásokkal
-
33 mins
erőforrás-allokációs projektütemezés
It seems "erőforrás-allokáció" is the term used for "resource-loading".
What is resource loading?
Resource loading is the assignment of labour, materials & equipment that will be required to successfully complete a particular task or activity.
https://www.linkedin.com/pulse/importance-resource-loading-p...
allokáció
1, Valamely erőforrás szabad kapacitásának használatba vétele;
https://idegen-szavak.hu/allokáció
See also:
https://www.google.hu/search?q=erőforrás-allokáció&ei=3AO7W7...
--------------------------------------------------
Note added at 37 mins (2018-10-08 07:24:12 GMT)
--------------------------------------------------
"Resource allocation, also called resource loading</by"
https://yourbusiness.azcentral.com/resource-allocation-vs-re...
--------------------------------------------------
Note added at 1 hr (2018-10-08 07:59:41 GMT)
--------------------------------------------------
Beírok egy harmadik idézetet is:
The main difference between resource allocation, also referred to as resource loading, and resource leveling
https://www.reference.com/business-finance/difference-betwee...
--------------------------------------------------
Note added at 1 hr (2018-10-08 08:04:59 GMT)
--------------------------------------------------
Írok még kettő példát, talán ennyi elég lesz:
ˇLoading (resource allocation)"
oktato.econ.unideb.hu/kunandras/engMBA/SlidesPM/resources.ppt
"Resource loading is basically allocating resources to the activities at the right time"
https://www.coursehero.com/file/p6e7dj7/5-Resource-loading-a...
What is resource loading?
Resource loading is the assignment of labour, materials & equipment that will be required to successfully complete a particular task or activity.
https://www.linkedin.com/pulse/importance-resource-loading-p...
allokáció
1, Valamely erőforrás szabad kapacitásának használatba vétele;
https://idegen-szavak.hu/allokáció
See also:
https://www.google.hu/search?q=erőforrás-allokáció&ei=3AO7W7...
--------------------------------------------------
Note added at 37 mins (2018-10-08 07:24:12 GMT)
--------------------------------------------------
"Resource allocation, also called resource loading</by"
https://yourbusiness.azcentral.com/resource-allocation-vs-re...
--------------------------------------------------
Note added at 1 hr (2018-10-08 07:59:41 GMT)
--------------------------------------------------
Beírok egy harmadik idézetet is:
The main difference between resource allocation, also referred to as resource loading, and resource leveling
https://www.reference.com/business-finance/difference-betwee...
--------------------------------------------------
Note added at 1 hr (2018-10-08 08:04:59 GMT)
--------------------------------------------------
Írok még kettő példát, talán ennyi elég lesz:
ˇLoading (resource allocation)"
oktato.econ.unideb.hu/kunandras/engMBA/SlidesPM/resources.ppt
"Resource loading is basically allocating resources to the activities at the right time"
https://www.coursehero.com/file/p6e7dj7/5-Resource-loading-a...
Peer comment(s):
neutral |
Katalin Szilárd
: Az allokáció és a loading nem teljesen ugyanaz: "Resource loaded schedule is best used in combination with resource allocation plan". Ha az adott szövegben nincs különvéve, akkor jó. Sőt Székány Andrásnak is igaza van itt: csak nem fel hanem betöltik.
30 mins
|
A megjegyzésed megírásakor már szerepelt a válaszoman ezzel kapcsolatban egy idézet (lásd a legalsót) de itt egy másik: "Resource allocation, also known as resource loading" http://ascpro0.ascweb.org/archives/cd/2002/pro2002/2002/Jenk...
|
23 hrs
projekt leírása az erőforrások és a tervfeladatok megnevezésével
Nem fontos részletezni az erőforrásokat, de meg kell őket nevezni, ugyanúgy mint a projekten belüli tervfeladatokat.
Reference:
https://www.wrike.com/project-management-guide/faq/what-is-a-project-schedule-in-project-management/
Discussion
Mindenesetre észrevettem és javítottam.
Remélem így már jó.
A megrendelő a forrásnyelvi anyagban az általa ismert kifejezéseket "replace all" word funkcióval magyarosította. Én meg nem vettem észre, hogy így másoltam át.
Elnézést kérek mindenkitől, hogy egy sokáig nem reagáltam. Hirtelen el kellett utaznom.
Köszönöm.
Hamvas Sándor