Glossary entry (derived from question below)
Polish term or phrase:
Elektroenergetyczne linie kablowe średniego napięcia
English translation:
medium voltage (MV) power (cable) lines
Polish term
Elektroenergetyczne linie kablowe średniego napięcia
3 +2 | medium voltage (MV) power (cable) lines/MV power lines | Frank Szmulowicz, Ph. D. |
Jan 30, 2021 18:52: Frank Szmulowicz, Ph. D. changed "Level" from "Non-PRO" to "PRO"
Mar 28, 2021 12:35: Frank Szmulowicz, Ph. D. Created KOG entry
PRO (3): Joanna Rączka, Darius Saczuk, Frank Szmulowicz, Ph. D.
When entering new questions, KudoZ askers are given an opportunity* to classify the difficulty of their questions as 'easy' or 'pro'. If you feel a question marked 'easy' should actually be marked 'pro', and if you have earned more than 20 KudoZ points, you can click the "Vote PRO" button to recommend that change.
How to tell the difference between "easy" and "pro" questions:
An easy question is one that any bilingual person would be able to answer correctly. (Or in the case of monolingual questions, an easy question is one that any native speaker of the language would be able to answer correctly.)
A pro question is anything else... in other words, any question that requires knowledge or skills that are specialized (even slightly).
Another way to think of the difficulty levels is this: an easy question is one that deals with everyday conversation. A pro question is anything else.
When deciding between easy and pro, err on the side of pro. Most questions will be pro.
* Note: non-member askers are not given the option of entering 'pro' questions; the only way for their questions to be classified as 'pro' is for a ProZ.com member or members to re-classify it.
Proposed translations
medium voltage (MV) power (cable) lines/MV power lines
ccccccc
PL
linie kablowe sieć średniego napięcia straty energii żyła powrotna
EN
cable lines medium voltage network energy losses metallic cable screen
http://yadda.icm.edu.pl/yadda/element/bwmeta1.element.baztec...
Very Law Frequency (VLF) voltage test on-site has been applied widely for evaluating the status of installation and operation of medium voltage power cable lines
https://ieeexplore.ieee.org/document/7415244
Discussion