GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW) | ||||||
---|---|---|---|---|---|---|
|
19:27 Apr 21, 2019 |
Spanish to English translations [PRO] Tech/Engineering - Electronics / Elect Eng / Centrales de generación | |||||||
---|---|---|---|---|---|---|---|
|
| ||||||
| Selected response from: Wilsonn Perez Reyes El Salvador Local time: 19:12 | ||||||
Grading comment
|
Summary of answers provided | ||||
---|---|---|---|---|
4 +1 | connection and meter substation |
|
Summary of reference entries provided | |||
---|---|---|---|
Refs. |
| ||
|
Discussion entries: 2 | |
---|---|
connection and meter substation Explanation: Beginning of construction works Execution of works for the connection substation (Cerro Colorado Station) begins. http://www.astidey.com.uy/en/news/beginning-of-construction-... The following figure shows the wind turbines' layout, the 30kV network, the internal roads, the internal substation and UTE's connection substation. http://www.astidey.com.uy/en/content/wind-farm EN Meter substation LENGUA DE DESTINO Subestación de medición https://www.era.europa.eu/sites/default/files/activities/doc... |
| |
Grading comment
| ||
Login to enter a peer comment (or grade) |
43 mins peer agreement (net): +3 |
Reference: Refs. Reference information: https://www.osha.gov/SLTC/etools/electric_power/illustrated_... https://www.iic.org/en/projects/project-disclosure/11624-02/... The project consists of the installation of 35 Vestas V110-2.0 wind turbines with nominal capacity of 2.0 MW each, for a total installed capacity of 70 MW. The wind farm will be built under an operating lease agreement with the UTE. The project has a significant positive environmental impact given that it will generate electricity from a renewable resource and will result in a reduction in greenhouse gas emissions. The project includes the construction of a measuring and cutting station, a control center, a transformer substation, and a 150 kV transmission line of 6 km to connect the wind farm to the existing Salto-Arapey line. Also, 20 km of internal roads will be built, 7 m wide, to enable access to each of the wind turbines, to the substation, and to the control and measurement stations. The wind turbines will be connected to the substation with medium-voltage (31.5 kV) underground cables. How are CTs connected in the 33/11 KV substation? - Quora https://www.quora.com/How-are-CTs-connected-in-the-33-11-KV.... - 31 ago. 2018 - They are used in a substation for metering and protection purpose. CT primary winding is connected in series with line while the secondary ... (this is where I got the idea of "metering"). http://biblioteca.olade.org/opac-tmpl/Documentos/hm000176.pd... see pages 15 onwards about "Salto Grande" in English. I doubt it will help much. https://www.saltogrande.org/transmision.php What I would say is a "connecting and metering substation". |
| |