Asked | Open questions | Answered
Points Date Pair Term / Answer given Level Status Gloss
4 Oct 29 '21 eng>fra PEA level design conception au stade de l'EEP pro closed ok
4 Mar 13 '21 eng>fra a stone drift floor une sole/dai(s)ne d'une galerie au rocher pro closed no
4 Mar 2 '21 eng>fra CIL bottle roll test essai bouteille (en rotation) du procédé CIL pro closed ok
4 Mar 2 '21 eng>fra bioleach batch amenability test essai sur lot d'évaluation de la susceptibilité à la biolixiviation pro closed ok
4 Oct 22 '20 eng>fra cutter bulk sampling (sondage d')échantillonnage massif au cutter/à la fraise pro closed ok
4 Oct 22 '20 eng>fra cutter soil mixing wall paroi CSM (fraisage et mélange du sol) pro closed ok
4 Oct 22 '20 eng>fra cutter and grab Cutter et bennes (hydrauliques) pro closed ok
- Jan 30 '20 eng>fra previous WGDE footprinting tasks tâches de footprinting qui ont été menées par le GTED pro closed no
Asked | Open questions | Answered